Strategic Investment · Central Java, Indonesia

Anode Battery Super Capacitor Factory — Purwokerto

Vertically integrated manufacturing of activated carbon anode material from coconut shell biomass — powering the next generation of energy storage at the heart of Central Java's raw material belt.

520 t
Shell / month capacity
18,640
m² facility area
$132
Labor cost / worker / month (USD)
5–6 h
To Tanjung Mas export port
720 t / month regional surplus
Coconut shell available — 38% buffer above production target

Why Now · Why Indonesia

A Market at Inflection Point

Energy storage demand is accelerating globally. Activated carbon from coconut shell is the highest-performing feedstock for supercapacitor anodes — and Indonesia supplies over 18% of the world's coconut production.

Supercapacitor Demand

Supercapacitors bridge batteries and capacitors — critical for EVs, renewable energy buffering, and grid stabilization. Global CAGR exceeds 20% through 2030.

Coconut Shell Advantage

Coconut shell-derived activated carbon delivers superior surface area (1,000–2,000 m²/g) for supercapacitor electrodes — outperforming synthetic alternatives at a fraction of the cost.

Indonesia's Position

World's 3rd largest coconut producer. Central Java processes millions of coconuts monthly — Purwokerto sits at the center of this supply ring with direct port access to Asia-Pacific markets.


Raw Material Security

Fully Secured Supply Chain

Six regional supply zones provide a combined monthly surplus exceeding factory requirements — eliminating feedstock risk and enabling production scaling.

Region Coconut / Month Shell Available Notes
Purbalingga300–400 t75–100 tCoconut tapping area
Banjarnegara300–400 t75–100 t9,600 t/year coconut production
Cilacap400–500 t100–125 tLarge land area, port access
Wangon (Banyumas)300–400 t75–100 tProximate to factory
Ciamis / Pangandaran600–800 t150–200 tMajor production base Largest
Purwokerto (Local)300–400 t75–100 tLocal buffer supply
TOTAL2,200–2,900 t520–720 t/monthExceeds production target

* Factory target: 520 t shell/month (~17 t/day). Regional surplus provides 38% overcapacity buffer for uninterrupted production.


Operational Flow

Production Process

From raw coconut shell to battery-grade activated carbon anode — a five-stage controlled manufacturing process.

Shell Collection

Sourced from 6 regional supply zones

Carbonization

Controlled pyrolysis of coconut shell

KOH Activation

Potassium hydroxide washing & activation chamber

Quality Control

Partner-supervised QA to spec

Export Packaging

40HC container to Tanjung Mas Port


Facility & Infrastructure

Purpose-Built Location Advantage

The Gunung Tugel facility in Purwokerto, Central Java combines institutional land affiliation, logistics access, and natural resources in one strategic location.

18,640 m² Facility

Total land with existing 795 m² warehouse (15×53 m) ready for immediate production setup.

University Land Partnership

Affiliated with Jendral Soedirman University — institutional stability and reduced land risk.

40HC Container Road Access

Directly facing a major provincial road — full 40-foot HC container truck access for outbound logistics.

Abundant Water Supply

3 on-site wells with confirmed clean water quality — critical for the KOH washing activation process.

Export Port Access

Tanjung Mas Port, Semarang: 5–6 hours by truck. Direct gateway to Asian and global markets.

Gunung Tugel, Purwokerto

Central Java Province, Indonesia

Lat: 7°25'S · Long: 109°14'E

Purwokerto acts as a central logistics hub connecting Purbalingga, Banjarnegara, Cilacap, Wangon, and Kebumen — all primary supply zones.


Why This Investment Wins

Structural Competitive Advantages

Three irreplaceable moats that protect returns and ensure supply continuity.

Ultra-Low Labor Cost

Banyumas minimum wage: IDR 2,200,000/month. At scale, labor represents a fraction of production cost vs. competitors in developed markets.

≈ $132 / worker / month

Biomass Supply Security

Regional surplus of 720 t/month coconut shell exceeds our 520 t/month production target — ensuring uninterrupted feedstock with a 38% buffer.

720 t / month available

Export-Ready Logistics

Direct provincial road access for 40HC trucks to Tanjung Mas Port — one of Java's primary container terminals. Factory gate to vessel in one seamless move.

5–6 h port transit

Partner With Us

Partnership & Investment Framework

We are seeking a strategic business partner to co-develop Southeast Asia's most efficient supercapacitor anode supply chain.

01

Technical Guidance & Layout

Partner provides production engineering: drying yard configuration, warehouse layout, and equipment specifications for optimal throughput.

02

Quality Assurance Oversight

Partner deploys a dedicated supervision team on-site to enforce quality standards at every production stage.

03

Machinery & Capital Investment

Investment in manufacturing equipment in exchange for guaranteed supply continuity and long-term offtake agreement.

04

Exclusive Indonesia Partnership

Purwokerto positioned as partner's anchor supercapacitor anode factory in Indonesia — first-mover advantage in an underserved supply chain.

What You Gain as Strategic Partner

A fully operational, biomass-secured, export-ready anode factory aligned with your supply requirements — without the land acquisition, labor, and logistics risk.

Guaranteed supply of battery-grade activated carbon at competitive cost
Exclusive preferred supplier status for Indonesia-origin anode material
18,640 m² ready facility — reduced capex vs. greenfield development
Institutional land affiliation (Jendral Soedirman University) — low tenure risk
Local regulatory experience and community supply network established
Export-ready to Tanjung Mas Port — 5–6 hours transit time
Schedule an Investor Briefing →

Investor Questions

Frequently Asked Questions

What is the monthly production capacity?

The factory targets 520 tons of coconut shell input per month (~17 tons/day), using a conversion ratio of approximately 25% shell-to-activated-carbon. Regional supply provides 720 t/month — a 38% buffer ensuring uninterrupted production.

Where exactly is the factory located?

Gunung Tugel, Purwokerto, Banyumas Regency, Central Java, Indonesia. The 18,640 m² site is affiliated with Jendral Soedirman University and directly fronts a major provincial road suitable for 40-foot HC container trucks.

What is the export logistics pathway?

Finished goods are loaded onto 40HC container trucks at the factory gate and transported to Tanjung Mas Port, Semarang — approximately 5–6 hours travel. Purwokerto is centrally connected to Purbalingga, Banjarnegara, Cilacap, Wangon, Ciamis, and Kebumen, enabling flexible supply routing.

What are the labor cost economics?

The 2025 Banyumas regional minimum wage is IDR 2,200,000/month (~USD 132). This represents exceptional cost efficiency compared to manufacturing hubs in China, South Korea, or Europe for similar anode production processes.

What infrastructure already exists on site?

The site includes an existing 795 m² warehouse (15×53 m), three functioning wells with confirmed clean water quality (critical for the KOH activation washing process), and direct provincial road frontage. The factory is production-ready pending equipment installation.

What does the partnership agreement involve?

We seek a strategic partner who provides: (1) technical guidance on production layout and equipment, (2) a supervision team for quality assurance, and (3) machinery and capital investment. In return, the partner receives guaranteed supply continuity and exclusive preferred supplier status from our Purwokerto facility.

The Energy Storage Revolution
Starts Here — Join Us

Request the full investor deck, schedule a site visit, or open a partnership discussion. Our team responds within 24 hours.

Request Investor Briefing

⚡ Invest Now